Jimah Energy Ventures Sdn Bhd ("JEV") is the special purpose company formed to develop, own
and operate the Project. JEV is a private limited company incorporated in Malaysia on 2nd October
2003.It. is gearing towards contributing the Nation by its active participation in the power sector to
cater for the increase in demand for electricity in the nearby future. JEV, as one of the leading private
energy companies in Malaysia, has set up a new Independent Power Producer (IPP) at Mukim Jimah,
district of Port Dickson, Negeri Sembilan Darul Khusus.
The Project consists of the construction and commissioning of two coal-fired generating units with net
capacity of 700 MW each, based on proven sub-critical technology. The Project includes ancillary
infrastructure such as a coal handling system, coal yard, ash pond and dedicated coal jetty.
To connect the power plant to the National Grid, the Project includes the construction of an approximately
93.7-kilometre transmission line from the Interconnection Facilities at the power plant to the Lenggeng
substation to the Olak Lempit substation (the "TWA Works"). Works related to the Lenggeng and Olak
Lempit substations have been carried out by Tenaga Nasional Berhad ("TNB"). Both the transmission
lines are transferred to TNB upon completion.